<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>References &#8211; Carmix</title>
	<atom:link href="https://www.carmix.com/en/references/feed/" rel="self" type="application/rss+xml" />
	<link>https://www.carmix.com/en/</link>
	<description></description>
	<lastBuildDate>Wed, 25 Sep 2024 08:53:34 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	

<image>
	<url>https://www.carmix.com/wp-content/uploads/2024/08/cropped-favicon-32x32.png</url>
	<title>References &#8211; Carmix</title>
	<link>https://www.carmix.com/en/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Worksites in Moanda Gabon</title>
		<link>https://www.carmix.com/en/references/worksites-in-moanda-gabon/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Tue, 29 Oct 2019 08:28:18 +0000</pubDate>
				<guid isPermaLink="false">https://beta.newwave-media.it/carmix/references/cantiere-moanda-gabon/</guid>

					<description><![CDATA[CARMIX FOR THE CONSTRUCTION OF 450 DWELLINGS NEAR THE MOAND MINE IN GABON The mining company Comilog, a subsidiary of the Eramet Group, has opted for the reliability and strength of Carmix machines for the construction of a large residential area near the Moanda mine in Gabon. Classified as the second most productive manganese mine [&#8230;]]]></description>
										<content:encoded><![CDATA[<h2>CARMIX FOR THE CONSTRUCTION OF 450 DWELLINGS NEAR THE MOAND MINE IN GABON</h2>
<p>The mining company Comilog, a subsidiary of the Eramet Group, has opted for the reliability and strength of Carmix machines for the construction of a large residential area near the Moanda mine in Gabon. Classified as the second most productive manganese mine in the world, the Moanda mine has required new routes to be constructed, which may guarantee both the transport of mineral ore and the safety of local inhabitants when Comilog-Eramet had to move people to a new residential area. Started in February 2019, the project has recently come into stream after a training period. It includes the construction of 450 housing units in 1.5 years (one house a day). To achieve this goal, Carmix supplied four Carmix 3.5 TT machines, three Trailer Pumps and three Carmix Baggers, thus ensuring full on-site production of large quantities of concrete in the shortest possible time. The construction idea is based on applying aluminium formworks on the interior and exterior of each house, in order to create a gap where all electrical and hydraulic conduits are laid, and then to fill it with concrete. When all aluminium structures have been removed, only concrete walls, partitions and ceilings will be standing, already equipped with all necessary arrangements. In addition to that, Carmix machines will be used for road construction and other mine-relevant works</p>
<p><strong>Carmix, the perfect solution for optimising construction site logistics</strong></p>
<p>Comilog-Eramet was very satisfied with Carmix machines, as they optimise site logistics, lower production times and cut costs, besides simplifying use conditions. The biggest challenge was meeting the set deadlines. However, by combining the Carmix Bagger, the cement-dosing mini silo of 3 m3 capacity, with the Trailer Pump, whose concrete pumping rate achieves 15 m3/h, production times could be reduced by 30%. Moreover, compared to most of our competitors whose weighing system is located in the loader, Carmix machines measure concrete directly in the truck. This makes Carmix a real OFFROAD MOBILE BATCHING PLANT, as it doses different aggregates with less than 2% error rate and its 4-wheel drive makes it suitable for any kind of terrain. Finally, the on-site training by Carmix technicians was the feather in the cap: the Carmix Academy is becoming increasingly strategic and decisive for construction operators in selecting Carmix.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Worksites in Mozambique</title>
		<link>https://www.carmix.com/en/references/worksites-in-mozambique/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Wed, 23 Jan 2019 13:33:39 +0000</pubDate>
				<guid isPermaLink="false">https://beta.newwave-media.it/carmix/references/cantiere-mozambico/</guid>

					<description><![CDATA[CARMIX 3500 TC AND CARMIX 3.5 TT: 5000 M3 OF CONCRETE FOR THE CONSTRUCTION OF 500 HOUSES IN MOZAMBIQUE Elevo Group South Africa, a leading Portuguese group in all engineering and construction sectors on a large and small scale, selected Carmix machines based on their reliability, efficiency and ease of use for an important project [&#8230;]]]></description>
										<content:encoded><![CDATA[<h2>CARMIX 3500 TC AND CARMIX 3.5 TT: 5000 M3 OF CONCRETE FOR THE CONSTRUCTION OF 500 HOUSES IN MOZAMBIQUE</h2>
<p>Elevo Group South Africa, a leading Portuguese group in all engineering and construction sectors on a large and small scale, selected Carmix machines based on their reliability, efficiency and ease of use for an important project lasting approximately two years: the construction of 500 houses in Massingir, a small village in Mozambique, near the Kruger natural park. The Client had requested 5000 m3 of concrete and for this reason they commissioned three units from Carmix South Africa: one Carmix 3500 TC, the flagship model, and two Carmix 3.5 TT machines.</p>
<h4>Training and customer service at a stone’s throw</h4>
<p>Shortly before the start of work all operators completed a five-day training course.  Classes were held by Jean Watson, Carmix Man Certified Training Manager, who taught them how to operate the two Carmix 3.5 TT units and the Carmix 3500 TC and how to behave in case of any needs. As a matter of fact, the main office of Carmix South Africa is not very far from the worksite. Therefore, it will not be difficult to provide technical assistance and pay site visits whenever necessary.</p>
<h4>The advantages to using the Carmix 3.5 TT and the new Carmix 3500 TC</h4>
<p>For the first few days of work, the two Carmix 3.5 TT and Carmix 3500 TC machines were used to cast the large concrete base and put the fencing around the construction site. With these first operations, the two smart mobile concrete batching plants already showed that they can move on any terrain, load and unload aggregates on site, mix concrete at any time and above all go anywhere, even in the smallest places. In addition, the technological performance of the Carmix 3500 TC was a great help in carrying out the work at the site. Thanks to the Concrete-Mate device installed in the cab, operators can add new mix design recipes, rename and modify them and, above all, quickly find them in case of need.</p>
<h4>Carmix 3500 TC: a concentrate of technology for a quality mix design</h4>
<p>Carmix 3500 TC is a true smart mobile concrete batching plant, engineered to offer greater comfort to the user with more ergonomic controls, all-round visibility and an air-conditioned cab. In addition, this machine is equipped with innovative technologies that improve concrete performance: with the Promix probe and the new Concrete-Mate batching system, it is possible to obtain a perfect mix suitable for every type of job and situation.e.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Worksites in San Francisco De Yojoa – Honduras</title>
		<link>https://www.carmix.com/en/references/worksites-in-san-francisco-de-yojoa-honduras/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Wed, 23 Jan 2019 13:27:15 +0000</pubDate>
				<guid isPermaLink="false">https://beta.newwave-media.it/carmix/references/cantiere-san-francisco-de-yojoa-honduras/</guid>

					<description><![CDATA[THE TECHNOLOGIC PERFORMANCE OF CARMIX 3500 TC FOR THE RIO LINDO HYDROELECTRIC POWER PLANT IN HONDURAS Our flagship model Carmix 3500 TC has been selected for the expansion and maintenance of the Rio Lindo hydroelectric power plant in San Francisco de Yojoa, Honduras. The Rio Lindo power plant, equally to the Cañaveral plant, uses the [&#8230;]]]></description>
										<content:encoded><![CDATA[<h2>THE TECHNOLOGIC PERFORMANCE OF CARMIX 3500 TC FOR THE RIO LINDO HYDROELECTRIC POWER PLANT IN HONDURAS</h2>
<p>Our flagship model Carmix 3500 TC has been selected for the expansion and maintenance of the Rio Lindo hydroelectric power plant in San Francisco de Yojoa, Honduras. The Rio Lindo power plant, equally to the Cañaveral plant, uses the water of lake Yojoa and together they account for 24% of the country’s hydroelectric power generating capacity. For this important project, which started in February 2018, HCC (Hidráulica Construcción y Conservación), a world leader in design and repair of hydraulic and industrial plants, relied on the versatility and technologic performance of Carmix 3500 TC to produce large volumes of fresh concrete rapidly.</p>
<p><em>«This is the first time we use Carmix 3500TC – <strong>commented David Zepeda, General Manager at HCC</strong> – and we are very satisfied with our choice, as we can produce more than 80 m3 of concrete per day. Another big advantage is that we can see mix design data in real time and get a dosage report with the Promix and Concrete-Mate technology. All this lets us save time and above all cut the costs».</em></p>
<h4>CARMIX 3500 TC: UN CONCENTRATO DI TECNOLOGIA PER UN MIX DI DESIGN DI QUALITÀ</h4>
<p>Carmix 3500 TC è una vera centrale mobile di calcestruzzo dal design “intelligente”, studiato soprattutto per offrire maggior confort all’utilizzatore con comani più ergonomici, visbilità panoramica e cabina climatizzata. Questa macchina, inoltre, è dotata di tecnologie innovative che migliorano le prestazioni del calcestruzzo: con la sonda Promix e il nuovo sistema di dosaggio Concrete-Mate è possibile, infatti, ottenere un impasto perfetto e adatto a ogni tipo di lavoro e situazione. </p>
<h4>DIGITAL TECHNOLOGIES FOR A PERFECT PRODUCT</h4>
<p>Promix is a measuring instrument consisting of a stainless steel probe, housed inside the mixing unit and powered by a solar panel, and of a cabin display receiving information in real time. The sensor provides data on slump, temperature, humidity, mixer rotation speed and a warning when the mix is ready. All the data is updated every ten seconds and sent to the receiver. An easy-to-read display informs the operator on the parameters of the concrete that is being prepared. This information can be stored in an external computer or sent to other mobile devices via the GPS network. </p>
<h4>A WORLD-UNIQUE MIX DESIGN MANAGER</h4>
<p>Concrete-Mate is the innovative mix design manager including an RMC Plant standard level management software which, using four sensors in the mixing unit, guarantees a top-quality concrete mix complying with international concrete production standards (UNI 206-1 – ASTM – ACI, etc) and complete control over production costs. Up to 15 different mixes and 99 types of materials can be selected with Concrete-Mate, allowing the production of multiple combinations of materials, fitting any worksite requirement. When the software has stored a mix design, it suggests to the operator the dosage of each element, the sequence of operations and the working time for each process step, thus eliminating any chance of error. Concrete-Mate can prepare concrete on site, offering a top-quality product, ready to be used anywhere, at all latitudes, rapidly and timely.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Worksites in Mantaro – Montalvo Perù</title>
		<link>https://www.carmix.com/en/references/worksites-in-mantaro-montalvo-peru/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Wed, 23 Jan 2019 11:58:00 +0000</pubDate>
				<guid isPermaLink="false">https://beta.newwave-media.it/carmix/references/cantiere-mantaro-montalvo-peru/</guid>

					<description><![CDATA[CARMIX DUMPER D6: GREAT PERFORMANCE ON THE MANTARO – MONTALVO (MAMO) TRANSMISSION LINE IN PERU SDV Energía e Infraestructura, S.L., the international company specialized in the construction of power transmission lines and electrical substations in Latin America, has been involved in the construction of a 500 kV transmission line from Mantaro to Montalvo, Peru. For [&#8230;]]]></description>
										<content:encoded><![CDATA[<h2>CARMIX DUMPER D6: GREAT PERFORMANCE ON THE MANTARO – MONTALVO (MAMO) TRANSMISSION LINE IN PERU </h2>
<p>SDV Energía e Infraestructura, S.L., the international company specialized in the construction of power transmission lines and electrical substations in Latin America, has been involved in the construction of a 500 kV transmission line from Mantaro to Montalvo, Peru. For this important project, which will help to transfer the energy generated in the central area of the country to the south, the Client has relied on the high performance and Made-in-Italy quality of Carmix. The vehicle selected, a Carmix Dumper D6, can actually move quickly over the rough, mountainous terrain typical of the area, and operate in any situation.</p>
<h4>STABILITY AND POWER FOR GREAT VERSATILITY</h4>
<p>Carmix Dumper D6 is the off-road dumper by Metalgalante Carmix that can meet from the simplest to the most demanding jobsite requirements. This 4X4X4 dumper features a specially sized chassis for off-road operations, can climb up to 30% slopes and travel smoothly on dirt roads as well as in quarries or opencast and underground mines. In this case, Carmix Dumper D6 proved to be very versatile for the many jobsite operations. Its performance was effective both in loading and carrying building materials (sand, aggregates, cement) and in transporting parts for the installation of transmission towers. Moreover, the four-wheel drive of Carmix Dumper D6 made it possible for worker teams to travel long distances quickly and easily on the local mountainous terrains. </p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Worksites in Chihuahua Messico</title>
		<link>https://www.carmix.com/en/references/worksites-in-chihuahua-messico/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Wed, 23 Jan 2019 11:48:17 +0000</pubDate>
				<guid isPermaLink="false">https://beta.newwave-media.it/carmix/references/cantiere-chihuahua-messico/</guid>

					<description><![CDATA[THE INNOVATIVE CARMIX 3500 TC AT WORK ON THE CONCHEÑO MINE, MEXICO Launched in preview last year, the innovative 3500 TC has been selected for an important project in Mexico: the Concheño Mine. This silver-gold open pit and underground mine in the state of Chihuahua was opened in 2013 and can produce 15000 tons every [&#8230;]]]></description>
										<content:encoded><![CDATA[<h2>THE INNOVATIVE CARMIX 3500 TC AT WORK ON THE CONCHEÑO MINE, MEXICO</h2>
<p>Launched in preview last year, the innovative 3500 TC has been selected for an important project in Mexico: the Concheño Mine. This silver-gold open pit and underground mine in the state of Chihuahua was opened in 2013 and can produce 15000 tons every day. In this context, Minera Real de Angeles opted for four Carmix 3500 TC machines for the construction of access roads to the mine.</p>
<p><em>«The great productivity of the 3500 TC – commented Luis Antonio Herrera Amante, Carmix Specialist for Carmix Tracsa dealer – CAT Rental Store – is a key factor for working in wide worksites like the Concheño Mine. This new machine is performing excellently in terms of versatility and flexibility and can work in difficult environments».</em></p>
<p>The reliability of Carmix machines was already well known to the Minera Real De Angeles staff, having worked with a 3.5TT model in the mine for almost two years. At the beginning of 2017, the quality and versatility of our means, joint to the prompt availability of spares and a timely customer service induced the company to order four 3500 TC machines.</p>
<p>Indeed, what they required was to have highly efficient machines, able to work in extremely harsh conditions and travel on very bumpy dirt roads with 20 to 30 degree slopes, in a particularly humid microclimate. The new 3500 TC machines have proved an efficient solution to reach even the most inaccessible areas of the mine safely and comfortably for the operators. Moreover, they have helped to increase concrete productivity and boost the work progress.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Worksites in Onseepkan Northern Cape</title>
		<link>https://www.carmix.com/en/references/worksites-in-onseepkan-northern-cape/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Wed, 23 Jan 2019 11:28:49 +0000</pubDate>
				<guid isPermaLink="false">https://beta.newwave-media.it/carmix/references/i-cantieri-di-onseepkan-nella-regione-del-capo-settentrionale/</guid>

					<description><![CDATA[CARMIX 3.5TT MIXES 25MPA CONCRETE FOR THE DEPARTMENT OF AGRICULTURE IN ONSEEPKANS, NORTHERN CAPE The Carmix South Africa team recently completed a floor slab for the Department of Agriculture in Onseepkans, Northern Cape. Onseepkans is a small town situated on the Orange River and acts as a border post between South Africa and Namibia. The [&#8230;]]]></description>
										<content:encoded><![CDATA[<h2>CARMIX 3.5TT MIXES 25MPA CONCRETE FOR THE DEPARTMENT OF AGRICULTURE IN ONSEEPKANS, NORTHERN CAPE </h2>
<p>The Carmix South Africa team recently completed a floor slab for the Department of Agriculture in Onseepkans, Northern Cape. Onseepkans is a small town situated on the Orange River and acts as a border post between South Africa and Namibia. The region is a highly productive grape farming area and it is only accessible by 50km of dirt road, which removes ready mix concrete as a viable option for concrete supply. The land redistribution movement in South Africa has resulted in the community of Onseepkans being designated 40 hectares of land suitable for the production of table grapes and raisins. The Carmix solution used for this project was Carmix 3.5TT, which produced 25mpa concrete for the storage facility where the grapes have been stored before delivery. Using the Carmix 3.5TT, the 70m3 floor slab took four days to complete as concrete batching was stopped to allow time for floating.</p>
<h4>A SOLUTION FOR EVERY INCOVENIENCE</h4>
<p>On the fourth and final day, the Carmix 3.5TT threw a fan-belt risking to stop the production. Sometimes, an engine failure can lead to extreme situations, such as having to interrupt all activities when finding the spare parts needed becomes an issue. That is not the case of Carmix. As a matter of fact, the inconvenience was promptly resolved since the Perkins engine installed on the self-loading cement mixer was found in no time. This shows the benefit of having a Carmix where spares are readily available even in the most isolated areas.</p>
<h4>CARMIX 3.5TT, SYNONYMOUS OF AGILITY AND PRODUCTIVITY</h4>
<p>Carmix 3.5TT is the small mobile batching plant agile and easy to use: its length – just over five meters with the front loader raised – can reach any place and operate in small spaces. There is also the ability to rotate the barrel at 300° to load from over two meters of height on all four sides of the machine. This way, it is possible to direct the concrete jet with the utmost precision, leaving the machine motionless on a single spot. The short turning radius, 1700 mm internally and 3700 mm externally, ensures great agility on site.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Worksites in Tanzania</title>
		<link>https://www.carmix.com/en/references/worksites-in-tanzania/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Wed, 23 Jan 2019 11:11:49 +0000</pubDate>
				<guid isPermaLink="false">https://beta.newwave-media.it/carmix/references/cantiere-tanzania/</guid>

					<description><![CDATA[VERSATILE CARMIX TAKES CONCRETE TO NORTH MARA GOLD MINE IN TANZANIA The gold mine in North Mara is situated in the north-west of Tanzania, at about 100 kilometres east of Lake Victoria and 20 kilometres south of the border with Kenya. The gold mine works an average of 8,000 tonnes of minerals a day and [&#8230;]]]></description>
										<content:encoded><![CDATA[<h2>VERSATILE CARMIX TAKES CONCRETE TO NORTH MARA GOLD MINE IN TANZANIA</h2>
<p>The gold mine in North Mara is situated in the north-west of Tanzania, at about 100 kilometres east of Lake Victoria and 20 kilometres south of the border with Kenya. The gold mine works an average of 8,000 tonnes of minerals a day and produced 287,188 ounces of gold in 2015. The gold mine has two deposits: one underground in Gokona and an open mine in Nyabirama. For the former, a flexible high-performance machine was required that was able to produce the concrete necessary for strengthening the walls of the entrance tunnels, thus avoiding the detachment of debris. The difficult terrain, with steep slopes, required a machine that could operate under extreme conditions. Moreover, the concrete had to be of the highest quality for use in the very difficult conditions of mines. The Carmix solution chosen by the customer was Carmix 5.5XL, a model that combines easy manoeuvring with high output in situations that require power, versatility and precision.</p>
<h4>A COMPLETE CONCRETE MIXER SYSTEM ON FOUR WHEELS</h4>
<p>Carmix 5.5XL is the ideal combination of what the company offers professionals: an independent concrete mixer system that produces large quantities of concrete directly at the worksite. The concrete mixer unit has a capacity of 7,600 litres, with an effective output for the mix of 5.5 m3. Inside it, a system with a double mixing blade, a drum with hydraulic rotation and a planetary reducer provide a uniform and compact mix. This result is also achieved thanks to an automatic loading system, which, with the aid of the front cab, next to the loading shovel, allows maximum visibility for operations. Control and monitoring tools play a key role: Carmix 5.5 XL is fitted with Joymix, a servo-controlled joystick that controls the hydraulic functions of the loading shovel and allows the concrete to be discharged up to two metres in height. In addition, an optional Load Cell weighing system is available, with load cells under the concrete mixer unit, for producing high-quality concrete.</p>
<h4>DESIGN THAT FACILITATES AND OPTIMIZES WORK</h4>
<p>Like the entire Carmix line, this model also comes in simple design for operators, where every component meets the operational needs of professionals. For example, four-wheel steering facilitates manoeuvring in restricted spaces, thus optimizing movements. In addition, the Perkins 112 kW motor with six water-cooled cylinders and an integrated four-wheel drive system ensures the power required to work at difficult worksites, with gradients of up to 30%. The particularly tough conditions of the terrain at the gold mine and the challenging access routes required flexible machines that are able to tackle very steep climbs and descents while carrying a full load</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Sochi Winter Games Worksite</title>
		<link>https://www.carmix.com/en/references/sochi-winter-games-worksite/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Thu, 18 Jun 2015 16:45:13 +0000</pubDate>
				<guid isPermaLink="false">https://beta.newwave-media.it/carmix/references/cantiere-sochi-giochi-invernali/</guid>

					<description><![CDATA[]]></description>
										<content:encoded><![CDATA[]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Roadworks</title>
		<link>https://www.carmix.com/en/references/roadworks/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Thu, 18 Jun 2015 16:44:07 +0000</pubDate>
				<guid isPermaLink="false">https://beta.newwave-media.it/carmix/references/cantieri-stradali/</guid>

					<description><![CDATA[Carmix self-loading concrete mixers at work in roadworks construction.]]></description>
										<content:encoded><![CDATA[<p>Carmix self-loading concrete mixers at work in roadworks construction.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Military worksites</title>
		<link>https://www.carmix.com/en/references/military-worksites/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Thu, 18 Jun 2015 16:42:11 +0000</pubDate>
				<guid isPermaLink="false">https://beta.newwave-media.it/carmix/references/cantieri-militare/</guid>

					<description><![CDATA[]]></description>
										<content:encoded><![CDATA[]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
